Atascadero, CA 93422,9955 Corriente RD
See all 52 photos
Atascadero, CA 93422,9955 Corriente RD
Atascadero, CA 93422,9955 Corriente RD
Atascadero, CA 93422,9955 Corriente RD
Atascadero, CA 93422,9955 Corriente RD
REQUEST A TOUR If you would like to see this home without being there in person, select the "Virtual Tour" option and your agent will contact you to discuss available opportunities.
In-PersonVirtual Tour
Tue
1
Jul
Wed
2
Jul
Thu
3
Jul
Bobbie Sepulveda
$ 1,298,000
Est. payment /mo
Save
Pending

9955 Corriente RD Atascadero, CA 93422

3 Beds

3 Baths

3,052 SqFt


UPDATED:

Key Details

Property Type Single Family Home

Sub Type Single Family Residence

Listing Status Pending

Purchase Type For Sale

Square Footage 3,052 sqft

Price per Sqft $425

Subdivision Atsouthwest(50)

MLS Listing ID NS25120968

Bedrooms 3

Full Baths 2

Half Baths 1

Construction Status Turnkey

HOA Y/N No

Year Built 1991

Lot Size 7.980 Acres

Property Sub-Type Single Family Residence

Property Description

First Time on the Market – Original Owner!
Nestled on nearly 8 pristine acres in Atascadero's desirable west side, this exceptional 3,052 sq. ft. single-level home is being offered for the first time. Built in 1991 and lovingly maintained by its original owner, the property blends timeless craftsmanship with thoughtful design, offering space, privacy, and flexibility for a variety of lifestyles. Spacious Layout: 3 large bedrooms, 2.5 bathrooms, and a dedicated office—perfect for working from home or creating a quiet retreat. Welcoming Living Areas: Formal living and dining rooms plus a warm and inviting family room with pellet stove, ideal for gatherings and relaxation.Gourmet Kitchen: Featuring a double oven, generous counter space, a breakfast nook, and hardwood flooring that continues into the hallway, adding both beauty and durability to the home's main living spaces.Primary Suite Retreat: Enjoy a spacious bedroom with serene views, dual vanities, a Jacuzzi soaking tub, and ample closet space. High-End Touches: A formal entry with high ceilings, recessed lighting, two wood-burning/Gas fireplaces, and hardwood flooring in key areas create an elevated yet comfortable atmosphere. Recent Improvements: Fresh interior and exterior paint, New HAVC and a brand-new roof make this home move-in ready. Abundant Storage & Utility: Three-car garage, an impressive 25'x40' workshop, RV/boat Covered parking, and a storage shed provide room for all your tools, toys, and hobbies. Outdoor Living: Enjoy manicured, park-like grounds and breathtaking views from nearly every room—perfect for morning coffee or evening sunsets. Set in a peaceful, private location yet just minutes from town, 9955 Corriente Road offers a rare combination of space, comfort, and Central Coast beauty. This won't last long! Call today for your private showing.

Location

State CA

County San Luis Obispo

Area Atsc - Atascadero

Zoning RS

Rooms

Other Rooms Barn(s), Second Garage, Shed(s), Workshop

Main Level Bedrooms 3

Interior

Interior Features Breakfast Bar, Ceiling Fan(s), Central Vacuum, Separate/Formal Dining Room, Eat-in Kitchen, High Ceilings, Open Floorplan, Recessed Lighting, Bar, All Bedrooms Down, Main Level Primary, Primary Suite, Walk-In Closet(s), Workshop

Heating Forced Air, Fireplace(s), Natural Gas, Wood

Cooling Central Air

Flooring Carpet, Wood

Fireplaces Type Family Room, Living Room, Primary Bedroom, Pellet Stove

Inclusions soft water system/Reverse osmoisis

Fireplace Yes

Appliance Double Oven, Dishwasher, Electric Cooktop, Disposal, Gas Water Heater, Microwave, Water Softener, Water To Refrigerator, Water Purifier

Laundry Electric Dryer Hookup, Gas Dryer Hookup, Laundry Room

Exterior

Exterior Feature Rain Gutters

Parking Features Boat, Door-Multi, Garage, Oversized, Paved, RV Garage, RV Access/Parking, Workshop in Garage

Garage Spaces 3.0

Garage Description 3.0

Pool None

Community Features Rural

Utilities Available Cable Available, Electricity Connected, Natural Gas Connected, Phone Available, Sewer Not Available, Water Connected

View Y/N Yes

View Meadow, Mountain(s)

Roof Type Tile

Accessibility None

Porch Concrete

Total Parking Spaces 3

Private Pool No

Building

Lot Description 6-10 Units/Acre, Sprinklers In Rear, Sprinklers In Front

Dwelling Type House

Story 1

Entry Level One

Sewer Septic Type Unknown

Water Public

Level or Stories One

Additional Building Barn(s), Second Garage, Shed(s), Workshop

New Construction No

Construction Status Turnkey

Schools

School District Atascadero Unified

Others

Senior Community No

Tax ID 050262009

Security Features Carbon Monoxide Detector(s)

Acceptable Financing Cash, Cash to New Loan, Conventional, 1031 Exchange

Listing Terms Cash, Cash to New Loan, Conventional, 1031 Exchange

Special Listing Condition Standard


CRMLS – RECore
Listed by Julianne DesJardins Richardson Sotheby's International Realty 805-712-9375
agent

Bobbie Sepulveda

Agent | License ID: 02224775

+1(858) 229-2364

GET MORE INFORMATION

Name
Phone*
Message

Go tour this home

9955 Corriente RD